T/SHMHZQ 048-2021 Active Group standards

T/SHMHZQ 048-2021 Base station transmission equipment installation specifications

T/SHMHZQ 048-2021 Base station transmission equipment installation specifications

Publish Date: 2021-11-04 Implement Date: 2021-11-04 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/SHMHZQ 048-2021
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Communication equipment
ICS Name: Construction technology
Publish Date: 2021-11-04
Implement Date: 2021-11-04

Scope

Scope: It specifies the terms and definitions of the installation norms for base station transmission equipment, the requirements for preparation of transmission installation, the equipment installation plan, the design and installation of lightning protection and grounding, the installation and construction of supporting equipment, and the requirements for electromagnetic radiation after installation. Applicable to the installation of base station transmission equipment of Shanghai Kaiyuan Communication Technology Co., Ltd. Main technical content: 3 Terms and Definitions 3.1 BBU Equipment 3.2 RRU Equipment 4 General Principles 5 Requirements for Installation Preparation 5.1 Organization Plan for Installation 5.2 Conditions Required Before Installation 5.3 On-site Management of Installation 6 Transmission Equipment Installation Plan 6.1 Installation of BBU Equipment 6.2 Installation of RRU Equipment 6.3 Installation of Cabling Racks in the Equipment Room 6.4 Optical Fiber Deployment and Networking between BBU and RRU 7 Design and Installation of Lightning Protection and Grounding 7.1 Lightning Protection and Grounding of Feeder Lines 7.2 Lightning Protection and Grounding of Other Facilities 8 Installation and Construction of Supporting Equipment 8.1 Base Station Equipment Room 8.2 GPS Antenna Installation 8.3 Feeder Line Deployment 8.4 Installation of Passive Components 9 Requirements for Electromagnetic Radiation after Installation References

Development Information

Related Standards

Contact Us