T/SDL 7-2024 Active Group standards

T/SDL 7-2024 Shenzhen New Power System Industrial Park for Distribution and Operation of Power Supply and Charging Inspection and Remuneration Standards

T/SDL 7-2024 Shenzhen New Power System Industrial Park for Distribution and Operation of Power Supply and Charging Inspection and Remuneration Standards

Publish Date: 2024-11-07 Implement Date: 2024-12-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/SDL 7-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Comprehensive Electrical Engineering
Publish Date: 2024-11-07
Implement Date: 2024-12-01

Scope

Main technical content: The main technical content of this standard includes: 1 General Provisions; 2 Terms; 3 Content and standards of operation and maintenance work; 4 Composition of operation and maintenance costs; 5 Calculation rules for operation and maintenance costs; 6 Methods of preparing operation and maintenance costs; 7 Adjustment of operation and maintenance cost standards; 8 Appendixes; 9 List of referenced standards. This standard is approved and issued by the Shenzhen Electricity Industry Association, and the technical content is interpreted by the drafting units such as Guangdong Dingli Engineering Consulting Co., Ltd. During the implementation of this standard, if you have any opinions or suggestions, please send them to the Shenzhen Electricity Industry Association (address: Shenzhen Power Supply Bureau Building, No. 2 Yanhexi, Luohu District, Shenzhen City, Postal Code: 518000), so that they can be referred to for future amendments.

Development Information

Related Standards

Contact Us