T/CEEIA 681-2023 Active Group standards

T/CEEIA 681-2023 Nuclear power electrical equipment temperature/humidity combination test under live conditions

T/CEEIA 681-2023 Nuclear power electrical equipment temperature/humidity combination test under live conditions

Publish Date: 2023-05-25 Implement Date: 2023-05-25 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEEIA 681-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Fuses and other overload protection devices
Publish Date: 2023-05-25
Implement Date: 2023-05-25

Scope

Scope: This document specifies the test conditions, test procedures, and information that should be provided in the test report for temperature/humidity combination tests of nuclear power electrical equipment under energized conditions. This document applies to temperature/humidity combination tests of electronic, electrical, and control equipment in nuclear power plants. Main technical content: This document specifies the test conditions, test procedures, and information that should be provided in the test report for temperature/humidity combination tests of nuclear power electrical equipment under energized conditions. This document applies to temperature/humidity combination tests of electronic, electrical, and control equipment in nuclear power plants.

Development Information

Related Standards

Contact Us