GB/T 18268.22-2025 Pending National standards

GB/T 18268.22-2025 Electrical equipment for measurement, control and laboratory use—EMC requirements—Part 22:Particular requirements—Test configurations, operational conditions and performance criteria for portable testing, measuring and monitoring equipment used in low-voltage distribution systems

GB/T 18268.22-2025 Electrical equipment for measurement, control and laboratory use—EMC requirements—Part 22:Particular requirements—Test configurations, operational conditions and performance criteria for portable testing, measuring and monitoring equipment used in low-voltage distribution systems

Publish Date: 2025-08-01 Implement Date: 2027-08-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 18268.22-2025
Standard Type: National standards
Standard Status: Pending
is_force_gb: no
CCS Name: Industrial automation instrumentation and control devices
ICS Name: The measurement of electrical and magnetic quantities
Publish Date: 2025-08-01
Implement Date: 2027-08-01
Publisher: 国家市场监督管理总局、国家标准化管理委员会
Technical Committee: 全国工业过程测量控制和自动化标准化技术委员会(SAC/TC 124)
Pages: 16 pages

Scope

除了GB/T 18268.1—2025的要求外,本文件更详细地规定了GB/T 18268.1—2025的附录A所涵盖的下列设备的试验配置、工作条件和性能判据:
——低压配电系统防护设施的试验、测量或监控设备;
——由电池和(或)被测电路供电的设备;
——便携式设备。
此类设备包括但不限于IEC 61557(所有部分)确定的电压检测器、绝缘电阻测试仪、接地导通电阻测试仪、接地电阻测试仪、泄漏电流钳、环路阻抗测试仪、“电流式漏电断路器测试仪”(RCD测试仪)和相序测试仪。
制造商应规定设备的预期使用环境,并从GB/T 18268.1—2025中选择适用的试验等级。

Development Information

Drafting Units:

上海工业自动化仪表研究院有限公司、上海仪器仪表自控系统检验测试所有限公司、上海仪电人工智能创新院有限公司、国核自仪系统工程有限公司、重庆川仪自动化股份有限公司、厦门宇电自动化科技有限公司、思源电气股份有限公司、上海市计量测试技术研究院、中国电子技术标准化研究院

Drafting Persons:

俞磊、孙瑜欣、王英、肖红练、周鹏成、刘爱青、张艾森、邹明伟、粟晓立、柳龙、金善益、冯嘉琳、乔家亿、姚惠钦、陈政宇

Word Count: 15 Thousand words Pages: 16 pages

Same series standard

Replace the following standards

Referenced Standards

Adopt standards

IEC 61326-2-2:2020

Related Standards

Contact Us