DL/T 1245-2024 Active Industry standards-Electricity

DL/T 1245-2024 Guidance for the operation of hydrogenerator regulation system in parallel operation

DL/T 1245-2024 Guidance for the operation of hydrogenerator regulation system in parallel operation

Publish Date: 2024-05-24 Implement Date: 2024-11-24 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: DL/T 1245-2024
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: \nHydraulic turbines and their auxiliary equipment
ICS Name: Hydraulic engineering
Publish Date: 2024-05-24
Implement Date: 2024-11-24

Scope

This document specifies the technical performance, parameters, and functional requirements of the grid-connected operation of hydroelectric turbine regulation systems (including pump-turbine regulation systems), as well as the test methods. This document is applicable to grid-connected hydroelectric units with a single-machine capacity of 10 MW or more. Other capacity hydroelectric units can also refer to and implement it accordingly.

Development Information

Replace the following standards

Related Standards

Contact Us