T/HEBSEA 8-2023 Mobile pressure vessel filling operation procedures
T/HEBSEA 8-2023 Mobile pressure vessel filling operation procedures
Basic Information
Scope
Main technical content: In the standard, Section 4, Basic Requirements: Includes requirements for operating personnel, site requirements, equipment and facilities, safety operation requirements, information tracking, and quality service requirements. In the standard, Section 5, General Operating Procedures: Includes pre-filling inspections, filling operation requirements, post-filling inspection requirements, prohibited filling requirements, filling records, and handling abnormal situations. Among these, handling abnormal situations includes: fire, toxic media leakage, reporting and alarming, emergency evacuation, isolating dangerous areas, on-site rescue, and requirements for handling overfilling. In the standard, Section 6, Typical Operating Procedures: Liquid chlorine tanker filling operation procedures, liquefied petroleum gas tanker filling operation procedures, liquefied natural gas tanker filling operation procedures, liquid oxygen tanker filling operation procedures, and compressed natural gas tanker filling operation procedures.