GB/T 2625-1981
Active
GB/T 22135-2019
Active
National standards
GB/T 22135-2019 Commissioning of electrical,instrumentation and control systems in the process industry—Specific phases and milestones
GB/T 22135-2019 Commissioning of electrical,instrumentation and control systems in the process industry—Specific phases and milestones
Basic Information
Standard Code:
GB/T 22135-2019
Standard Type:
National standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Industrial automation instrumentation and control devices
ICS Name:
The measurement and control of industrial processes
Publish Date:
2019-06-04
Implement Date:
2020-01-01
Pages:
30 pages
Scope
This standard defines the specific stages and milestones of the electrical, instrumentation, and control systems in the process industry during commissioning (see Figure 1). By way of example, this standard describes the activities during the period from the "installation in place" milestone to the acceptance of the equipment by the owner, and is applicable to various types of related process flows/equipment.
Note: This standard assumes that the "equipment acceptance" milestone occurs after the performance assessment. If the scope of work is reduced, this standard should also be appropriately modified.
Development Information
Replace the following standards
Referenced Standards
ISO 10628-2
IEC 62079
IEC 62424
ISA-S7.0.01 仪表气源质量标准
Adopt standards
IEC 62337:2012
Related Standards
GB/T 4830-1984
Replaced
GB/T 4830-1984 Pressure range and quality of air supply for the industrial process measurement and control instruments
GB/T 5692-1985
Abolished
GB/T 5692-1985 Definitions of CAMAC terms
GB/T 5693-1985
Abolished
GB/T 5693-1985 CAMAC organization of multi-crate systems specification of the branch-highway and CAMAC crate controller type A1
GB/T 5694-1985
Abolished
GB/T 5694-1985 Block transfers in CAMAC systems
GB/T 5691-1985
Abolished