T/ACEF 071-2023 Active Group standards

T/ACEF 071-2023 The pollutant control requirements for coupling municipal sewage treatment plant sludge treatment with coal-fired power plants

T/ACEF 071-2023 The pollutant control requirements for coupling municipal sewage treatment plant sludge treatment with coal-fired power plants

Publish Date: 2023-04-14 Implement Date: 2023-04-26 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Download

Basic Information

Standard Code: T/ACEF 071-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Environmental protection
ICS Name: \nFixed source emission limits
Publish Date: 2023-04-14
Implement Date: 2023-04-26
Pages: 10 pages

Scope

Scope: This document stipulates the requirements for sludge entering the furnace and emission control, pollutant monitoring, and compliance determination for coal-fired power plants that couple with the treatment of sludge from urban wastewater treatment plants. This document aims to promote more standardized and rational environmental management of coal-fired power plants that couple with the treatment of sludge from urban wastewater treatment plants, and is intended for reference by relevant departments. This document applies to the emission management of pollutants in coal-fired power plants that burn sludge from urban wastewater treatment plants. Other industrial sludge with similar properties that are not classified as hazardous waste can be referenced for implementation. Main technical content: Scope, normative reference documents, terms and definitions, requirements for sludge entering the furnace and emission control, pollutant monitoring requirements, and compliance determination requirements.

Development Information

Pages: 10 pages

Related Standards

Contact Us