T/SDPEA 0042-2025 Active Group standards

T/SDPEA 0042-2025 Guidelines for the integrated operation of the industrial park's power grid, sources, and storage

T/SDPEA 0042-2025 Guidelines for the integrated operation of the industrial park's power grid, sources, and storage

Publish Date: 2025-06-30 Implement Date: 2025-06-30 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/SDPEA 0042-2025
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Comprehensive Electrical Engineering
Publish Date: 2025-06-30
Implement Date: 2025-06-30

Scope

Main technical content: Guidelines for the integrated operation of sources, grids, loads, and energy storage in industrial parks. By integrating loads, sources, grids, and energy storage, it achieves efficient coordination and optimized operation among the sources, grids, loads, and energy storage. The overall focus is on self-consumption, prioritizing the utilization of green electricity, reducing reliance on public power grids, and enhancing the flexibility, reliability, and economy of the power system. It mainly includes the scope, normative reference documents, term definitions, general principles, park construction (loads, sources, grids, energy storage, energy management platforms), and operation and maintenance and management norms, with the aim of promoting the efficient, clean, and intelligent utilization of energy in industrial parks.

Development Information

Related Standards

Contact Us