T/XZBX 0099-2025 Forest ecological restoration project full-cycle management implementation guidelines
T/XZBX 0099-2025 Forest ecological restoration project full-cycle management implementation guidelines
Basic Information
Scope
With the increasingly serious ecological environmental problems, especially the ecological degradation of the Loess Plateau and wind-sand grassland areas, forestry ecological restoration has become one of the important tasks of environmental protection and sustainable development in China. Northern Shaanxi, located at the junction of the Loess Plateau and wind-sand grassland areas, is one of the typical ecologically fragile regions in China. Due to the harsh natural conditions, arid climate, and low vegetation coverage in this region, it has long been subject to environmental pressures such as water and soil erosion and wind sand invasion, resulting in the continuous deterioration of the ecological environment and posing severe challenges to social and economic development, ecological security, and people's quality of life. To effectively address these issues, it is crucial to carry out forestry ecological restoration projects. Through systematic ecological restoration measures, gradually restoring the ecological environment of the Loess Plateau and wind-sand grassland areas in Northern Shaanxi can not only improve the current situation of water and soil erosion in the region, but also effectively enhance land productivity, increase biodiversity, and improve ecological service functions. However, ecological restoration is a complex systemic project involving multiple aspects such as soil improvement, vegetation restoration, and water source protection, which requires scientific management and monitoring throughout the entire process. The purpose of formulating this document is to provide guidance for the full-cycle management of forestry ecological restoration projects in Northern Shaanxi, ensuring that the restoration work can be carried out efficiently and orderly, and sustainable ecological benefits can be continuously achieved. The document provides systematic technical and management methods from the pre-planning and design stage of the project to the monitor