T/CANSI 18-2020 Active Group standards

T/CANSI 18-2020 Design, Manufacture, and Installation Requirements for Double-Wall Pipe in Bunker Fuel Vessel Double-Walled Pipe Design and Fabrication

T/CANSI 18-2020 Design, Manufacture, and Installation Requirements for Double-Wall Pipe in Bunker Fuel Vessel Double-Walled Pipe Design and Fabrication

Publish Date: 2020-01-01 Implement Date: 2020-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CANSI 18-2020
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: \nShips
ICS Name: Other standards related to shipbuilding and marine structures
Publish Date: 2020-01-01
Implement Date: 2020-01-01

Scope

Scope: This standard applies to the design, manufacture, and installation of double-walled pipes for gas supply in the engine rooms of dual-fuel ships; Main technical content: This standard specifies the design, manufacture, and installation requirements for double-walled pipes on dual-fuel ships.

Development Information

Related Standards

Contact Us