T/CEEIA 315-2018 Abolished Group standards

T/CEEIA 315-2018 Guidelines for evaluating the quality of large-scale water turbines

T/CEEIA 315-2018 Guidelines for evaluating the quality of large-scale water turbines

Publish Date: 2018-12-24 Implement Date: 2018-12-24 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEEIA 315-2018
Standard Type: Group standards
Standard Status: Abolished
is_force_gb: no
CCS Name: \nHydraulic turbines and their auxiliary equipment
ICS Name: Hydraulic engineering
Publish Date: 2018-12-24
Implement Date: 2018-12-24

Scope

Main technical content: This standard includes five parts in total: 1. **Scope of Application**: Specifies the scope of application of this standard. It applies to large-scale hydroelectric turbine manufacturers. 2. **Normative Reference Documents**: Lists the main standards referenced in this standard. 3. **General Provisions**: Outlines the purpose of establishing this standard, the basis for its compilation, and the evaluation timeline. 4. **Product Quality Classification**: Provides classification requirements for ten aspects of large-scale hydroelectric turbine products, including material properties and chemical composition, performance in use, installation quality, operational performance, reliability and service life, completeness, packaging, component processing and assembly quality, production process, user evaluations, and user services. 5. **Evaluation Methods**: Describes the technical indicators of large-scale hydroelectric turbine products, which are inspected and evaluated based on relevant national and industry standards or testing methods defined by the manufacturer.

Development Information

Related Standards

Contact Us