GB/T 3794-1983
Abolished
T/CAPID 005.2-2023
Active
Group standards
T/CAPID 005.2-2023 Garbage incineration power generation engineering quality supervision and inspection outline Part 2: Supervision and inspection before the completion of the main plant structure roof
T/CAPID 005.2-2023 Garbage incineration power generation engineering quality supervision and inspection outline Part 2: Supervision and inspection before the completion of the main plant structure roof
Price:
$ 20.00
Basic Information
Standard Code:
T/CAPID 005.2-2023
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Integrated Energy and Heat Transfer Engineering
Publish Date:
2023-03-08
Implement Date:
2023-06-01
Scope
Main technical content: This document stipulates the supervision and inspection of the main structure of the main plant of the waste incineration power generation project before its roofing, including the general principles of supervision and inspection and the verification methods, the conditions that should be met for supervision and inspection, the requirements for supervision and inspection of the quality behavior of the responsible entities, the requirements for supervision and inspection of the physical quality of the project, and the quality supervision and testing requirements.
Development Information
Same series standard
T/CAPID 005.1-2023 Garbage incineration power generation engineering quality supervision and inspection outline Part 1: Supervision and inspection before zero meters of the garbage pit
T/CAPID 005.3-2023 Garbage incineration power generation engineering quality supervision and inspection outline Part 3: Supervision and inspection before boiler water pressure test
T/CAPID 005.4-2023 Garbage incineration power generation engineering quality supervision and inspection outline Part 4: Supervision and inspection before the acceptance of the power system of the plant's electrical system
T/CAPID 005.5-2023 Garbage incineration power generation project quality supervision and inspection outline Part 5: Supervision and inspection before complete startup commissioning test
Related Standards
GB/T 5623-1985
Replaced
GB/T 5623-1985 Guides for the stipulation and administration of electricity consumption norm of product
GB/T 6421-1986
Abolished
GB/T 6421-1986 Methods for drawing energy flow diagram of industrial enterprise
GB/T 6422-1986
Replaced
GB/T 6422-1986 Directives for measuring and testing energy consumption in industrial enterprises
GB/T 6425-1986
Replaced
GB/T 6425-1986 Nomenclature for thermal analysis
GB/T 8174-1987
Replaced