T/CEC 419-2020 Active Group standards

T/CEC 419-2020 Vibration-suppressing guideline for water turbine regulation system with pressure regulating valve

T/CEC 419-2020 Vibration-suppressing guideline for water turbine regulation system with pressure regulating valve

Publish Date: 2020-10-28 Implement Date: 2021-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEC 419-2020
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Integrated power station
Publish Date: 2020-10-28
Implement Date: 2021-02-01

Scope

This document specifies the working conditions, technical requirements, dynamic characteristic calculations, and tests for the adjustment system of hydroelectric turbines with pressure regulating valves. This document is applicable to the design and test acceptance of adjustment systems for hydroelectric turbines with pressure regulating valves.

Development Information

Related Standards

Contact Us