T/CAQI 388-2024 Active Group standards

T/CAQI 388-2024 Micro-hydro power station construction specifications

T/CAQI 388-2024 Micro-hydro power station construction specifications

Publish Date: 2024-05-13 Implement Date: 2024-05-27 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CAQI 388-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Hydraulic structures
Publish Date: 2024-05-13
Implement Date: 2024-05-27

Scope

Main technical content: This document stipulates the general requirements for the design and construction of micro-hydropower stations (hereinafter referred to as micro-hydropower stations), as well as the main contents of hydrology, geology, project scale, project layout and buildings, electromechanical and metal structures, fire prevention, construction organization design, land acquisition and resettlement of migrants, environmental protection, water and soil conservation, project management, energy and water conservation, labor safety and industrial hygiene, information construction and file management, project budget (estimate), and economic evaluation. It is applicable to the design and construction of micro-hydropower stations with an installed capacity of less than 500 kW.

Development Information

Related Standards

Contact Us