GB/T 4773-1984
Replaced
T/JSEPA 012-2023
Active
Group standards
T/JSEPA 012-2023 Diesel engine auxiliary gas turbine unit black start system field test guidelines
T/JSEPA 012-2023 Diesel engine auxiliary gas turbine unit black start system field test guidelines
Price:
$ 20.00
Basic Information
Standard Code:
T/JSEPA 012-2023
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Gas turbines, steam turbines, and steam engines
Publish Date:
2023-12-18
Implement Date:
2024-01-18
Scope
Main technical content: This document specifies the requirements for equipment integrity testing, performance testing, and test reports of the black start system for diesel engine-assisted gas turbine units on-site. This document is applicable to the on-site testing of the black start system for diesel engine-assisted split-shaft gas turbine units, with the wiring method described in Appendix A. For on-site testing of the diesel system auxiliary black start system of gas turbine units with other wiring methods, this document can be used as a reference.
Development Information
Related Standards
GB/T 5578-1985
Replaced
GB/T 5578-1985 Specification for stationary steam turbines driving generator
GB/T 11369-1989
Replaced
GB/T 11369-1989 Light weight gas turbines exhaust smokes measurement
GB/T 11370-1989
Replaced
GB/T 11370-1989 Gas emissions measurement of light weight gas turbines
GB/T 11371-1989
Replaced
GB/T 11371-1989 Light weight gas turbine operation and maintenance
GB/T 13399-1992
Replaced