T/CECA-G 0020-2019
Active
Group standards
T/CECA-G 0020-2019 Guidance for Industrial Park Participation in Electricity Demand Response Technology
T/CECA-G 0020-2019 Guidance for Industrial Park Participation in Electricity Demand Response Technology
Price:
$ 20.00
Basic Information
Standard Code:
T/CECA-G 0020-2019
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Electrician's Comprehensive Skills
ICS Name:
Integrated Energy and Heat Transfer Engineering
Publish Date:
2019-05-20
Implement Date:
2019-05-30
Scope
Main technical content: The overall technology should meet the following requirements: a) The park demand response system should, on the premise of ensuring power supply safety and qualified power quality, effectively integrate the demand response resources within the park and optimize their scheduling to maximize the benefits of participating in demand response, improve the energy efficiency of the park, and give priority to absorbing renewable energy; b) The park demand response system should design appropriate hardware and software systems and adopt appropriate information models and communication protocols to meet the requirements of function, performance, and security protection.
Development Information
Related Standards
GB/T 3794-1983
Abolished
GB/T 5623-1985
Replaced
GB/T 5623-1985 Guides for the stipulation and administration of electricity consumption norm of product
GB/T 6421-1986
Abolished
GB/T 6421-1986 Methods for drawing energy flow diagram of industrial enterprise
GB/T 6422-1986
Replaced
GB/T 6422-1986 Directives for measuring and testing energy consumption in industrial enterprises
GB/T 6425-1986
Replaced
GB/T 6425-1986 Nomenclature for thermal analysis
GB/T 8174-1987
Replaced