GB/T 3317-1982
Replaced
TB/T 2075.22-2024
Active
Industry standards-\nRailway
TB/T 2075.22-2024 Electrified Railway Overhead Contact Line Components Part 22: Tunnel Support and Positioning Devices
TB/T 2075.22-2024 TB/T 2075.22-2024 Electrified railway contact network parts - Part 22: Tunnel support and positioning devices
Price:
$ 30
Basic Information
Standard Code:
TB/T 2075.22-2024
Standard Type:
Industry standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Contact network parts
ICS Name:
Electric traction equipment
Publish Date:
2024-11-22
Implement Date:
2025-06-01
Development Information
Same series standard
TB/T 2075.1-2024 Electrified Railway Overhead Contact Line Components Part 1: Arm Support Devices
TB/T 2075.2-2024 Electrified Railway Overhead Contact Line Components Part 2: Arm Base
TB/T 2075.3-2024 Electrified Railway Overhead Contact Line Components Part 3: Limit-Type Positioning Devices
TB/T 2075.4-2024 Electrified Railway Overhead Contact Line Components Part 4: Non-Limit Type Positioning Devices
TB/T 2075.5-2024 Electrified Railway Overhead Contact Line Components Part 5: Terminal Anchor Line Clamps
TB/T 2075.6-2024 Electrified Railway Overhead Contact Network Components Part 6: Center Anchor Junction Devices
TB/T 2075.7-2024 Electrified Railway Overhead Contact Line Components Part 7: Overall Suspension Cables and Suspension Cable Clamps
TB/T 2075.8-2024 Electrified Railway Overhead Contact Line Components Part 8: Elastic Suspension Cable Devices
TB/T 2075.9-2024 Electrified Railway Overhead Contact Line Components Part 9: Joint Connection Clamps
TB/T 2075.10-2024 Electrified Railway Overhead Contact Line Components Part 10: Line Crossings
TB/T 2075.11-2024 Electrified Railway Overhead Contact Line Components Part 11: Electrical Connection Devices
TB/T 2075.12-2024 Electrified Railway Overhead Contact Line Components Part 12: Pulley Compensation Device
TB/T 2075.13-2024 Electrified Railway Overhead Contact Line Components Part 13: Ratchet Compensation Device
TB/T 2075.14-2024 Electrified Railway Overhead Contact Line Components Part 14: Spring Compensation Devices
TB/T 2075.15-2024 Electrified Railway Overhead Contact Line Components Part 15: Drop Weights and Drop Weight Restriction Frames
TB/T 2075.16-2024 Electrified Railway Overhead Contact Network Components Part 16: Soft Crossing Support and Fixing Devices
TB/T 2075.17-2024 Electrified Railway Overhead Contact Network Components Part 17: Soft Cross-arm Connection Devices
TB/T 2075.18-2024 Electrified Railway Overhead Contact Network Components Part 18: Soft Crossing Suspension Devices
TB/T 2075.19-2024 Electrified Railway Overhead Contact Line Components Part 19: Grounding Wire Clamps and Connecting Devices
TB/T 2075.20-2024 Electrified Railway Overhead Contact Line Components Part 20: Additional Conductor Components
TB/T 2075.21-2024 Electrified Railway Overhead Contact Line Components Part 21: Tunnel Horizontal Suspension Devices
TB/T 2075.23-2024 Electrified Railway Overhead Contact Line Components Part 23: Tunnel Anchor Compensation Devices
Replace the following standards
Related Standards
GB/T 3318-1982
Replaced
GB/T 3318-1982 Rules for the inspecting and testing of electric locomotives after completion of construction
GB/T 6927-1986
Abolished
GB/T 6927-1986 Characteristics and tests of electrodynamic and electromagnetic braking systems
GB 1402-1998
Replaced
GB 1402-1998 A.C.Voltage of electric traction for the railway main lines
GB/T 3319-1998
Replaced
GB/T 3319-1998 Definition of the rated output of electric locomotives and motive power units
GB 5914.1-2000
Replaced