T/CFSA 02-2014 Active Group standards

T/CFSA 02-2014 Technical Regulations for the Construction of the Early Dismantling System of Desktop Formwork

T/CFSA 02-2014

Publish Date: 2014-12-30 Implement Date: 2015-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CFSA 02-2014
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Integrated agriculture and forestry
ICS Name: Other building materials
Publish Date: 2014-12-30
Implement Date: 2015-02-01

Scope

1.0.1 In order to achieve technological advancement, safety, applicability, quality assurance, simplicity of operation, and economic rationality in the design and construction of the desktop formwork early dismantling system, these regulations are formulated. 1.0.2 The desktop formwork early dismantling system is suitable for the construction of cast-in-place concrete floor structures with a design strength grade of not less than C20. 1.0.3 Before using the desktop formwork early dismantling system for construction, a special construction plan shall be prepared in accordance with these regulations, and engineering formwork configuration diagrams and support or bracket structure diagrams shall be drawn, and the construction bearing capacity shall be checked. 1.0.4 In addition to these regulations, the design and construction of the desktop formwork early dismantling system shall also comply with the relevant national standards currently in force. 3.0.1 When using the desktop formwork early dismantling system for project construction, a special safety construction plan shall be prepared in accordance with the project structural construction drawings, the construction organization design, and these regulations, and implemented after being reviewed and approved. 3.0.2 The desktop formwork early dismantling system shall be used strictly in accordance with the allowable support span, height, and load. When the project conditions change, in order to ensure the safety of construction and use, it shall be designed separately. 3.0.3 The use of the desktop early dismantling formwork system must meet the site conditions where it can be set up, and strictly comply with the technical requirements and procedures for safe erection, use, instantaneous unloading and tightening, dismantling, and transfer. 3.0.4 Before erecting the desktop early dismantling formwork system, various construction preparations shall be carefully carried out. Its quality requirements and insp

Development Information

Related Standards

Contact Us