DL/T 2729-2024 Active Industry standards-Electricity

DL/T 2729-2024 Water turbine generator stator insulation partial discharge online monitoring and analysis system technical specification

DL/T 2729-2024 Water turbine generator stator insulation partial discharge online monitoring and analysis system technical specification

Publish Date: 2024-05-24 Implement Date: 2024-11-24 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: DL/T 2729-2024
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Automation devices for power station equipment
ICS Name: Integrated power station
Publish Date: 2024-05-24
Implement Date: 2024-11-24

Scope

This document specifies the technical requirements and testing and inspection procedures for the online monitoring and analysis system of insulation partial discharge in the stator windings of hydroelectric generators. This document is applicable to online monitoring and analysis systems of insulation partial discharge in the stator windings of medium- and large-sized hydroelectric generators.

Development Information

Related Standards

Contact Us