DL/T 5888-2024 Active Industry standards-Electricity

DL/T 5888-2024 DL/T 5888-2024 Hydraulic Deep-Mixing Grinding Wall Construction Technical Specification for Hydraulic Power and Water Conservancy Engineering

DL/T 5888-2024 DL/T 5888-2024 Hydraulic Deep-Mixing Grinding Wall Construction Technical Specification for Hydraulic Power and Water Conservancy Engineering

Publish Date: 2024-09-24 Implement Date: 2025-03-24 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: DL/T 5888-2024
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Hydropower projects
ICS Name: Hydraulic engineering
Publish Date: 2024-09-24
Implement Date: 2025-03-24

Scope

1.0.1 This standard is formulated to regulate the construction of deep-stirred and milled cement-soil impermeable walls in hydropower and water conservancy projects and ensure the quality of the projects. 1.0.2 This standard is applicable to hydropower and water conservancy projects. 1.0.3 Before the construction of deep-stirred and milled cement-soil impermeable walls, a construction plan shall be formulated based on comprehensive factors such as the engineering geology and hydrogeology, the characteristics of the project, the performance of the materials, and the construction conditions. 1.0.3 In addition to complying with this standard, the construction of deep-stirred and milled cement-soil impermeable walls shall also comply with the provisions of the relevant national standards currently in force.

Development Information

Related Standards

Contact Us