T/CIET 1175-2025 Active Group standards

T/CIET 1175-2025 Energy Storage Liquid Cooling Thermal Management Technology Specification

T/CIET 1175-2025 Energy storage liquid cooling thermal management technical specification

Publish Date: 2025-04-16 Implement Date: 2025-04-16 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CIET 1175-2025
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Integrated Energy and Heat Transfer Engineering
Publish Date: 2025-04-16
Implement Date: 2025-04-16

Scope

Scope: This document specifies the abbreviations, technical requirements, heat management system design, testing methods, and safety and maintenance for energy storage liquid-cooled thermal management. This document is applicable to energy storage non-contact liquid-cooled thermal management. Main technical content: This document specifies the abbreviations, technical requirements, heat management system design, testing methods, and safety and maintenance for energy storage liquid-cooled thermal management. This document is applicable to energy storage non-contact liquid-cooled thermal management.

Development Information

Related Standards

Contact Us