T/CIET 901-2024 Active Group standards

T/CIET 901-2024 Fully Automatic Baffle Rack Digital Production Line

T/CIET 901-2024 Fully Automatic Baffle Rack Digital Production Line

Publish Date: 2024-12-25 Implement Date: 2024-12-25 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CIET 901-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: The manufacturing molding process
Publish Date: 2024-12-25
Implement Date: 2024-12-25

Scope

Scope: This document specifies the equipment composition and basic parameters, basic requirements, technical requirements, digital requirements, safety requirements, test methods, inspection rules, marking, packaging, transportation, and storage of fully automatic frame and box digital production lines. This document is applicable to the manufacture and integration of fully automatic frame and box digital production lines; Main technical content: This document specifies the equipment composition and basic parameters, basic requirements, technical requirements, digital requirements, safety requirements, test methods, inspection rules, marking, packaging, transportation, and storage of fully automatic frame and box digital production lines. This document is applicable to the manufacture and integration of fully automatic frame and box digital production lines.

Development Information

Related Standards

Contact Us