T/SWSA 002-2025 Safety Management Specification for High-altitude Construction Work
T/SWSA 002-2025 Safety Management Specification for High-altitude Construction Work
Basic Information
Scope
Main technical content: The main content of this standard includes the classification of high-altitude work, personal protective equipment, work platforms, typical operations, work management, accident emergency rescue, and evaluation and improvement. (1) Scope: It provides a summary of the main content of this standard and the applicable scope of objects. (2) Normative reference documents: It lists the main normative documents involved. (3) Terms and definitions: Based on the standardized terms of national or industry standards, it defines the meanings of terms such as high-altitude work, safety risks, hidden safety hazards in production, safety ropes, operating platforms, edge-over operations, hole-opening operations, climbing operations, suspended operations, and cross-operating operations. Among them, the hidden safety hazards in production refer to the provisions in the *Shanghai Municipal Measures for the Investigation and Management of Hidden Safety Hazards in Production (Amendment 2024) (Decree No. 13 of the Shanghai Municipal People's Government)*. (4) Classification of high-altitude work: It stipulates the classification basis, working height, objective risk factors, and work classification. (5) Personal protective equipment: It stipulates the use of safety helmets, safety belts, speed-differential self-controllers, and safety nets. (6) Work platforms: It stipulates the use of operating platforms, construction scaffolds, lifting work platforms, and hanging baskets. (7) Typical operations: It stipulates edge-over operations, hole-opening operations, suspended operations, climbing operations, and cross-operating operations. (8) Work management: It stipulates basic requirements, work process management, personnel responsibilities, notification and warning, and hidden hazard investigation and management. (9) Accident emergency rescue: It stipulates on-site response plans, emergency rescue materials, rescue personnel, emergency drills, and em