DL/T 1190-2023 Active Industry standards-Electricity

DL/T 1190-2023 Insulated prong splicing terminal block。

DL/T 1190-2023 Insulated prong splicing terminal block。

Publish Date: 2023-10-11 Implement Date: 2024-04-11 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: DL/T 1190-2023
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Transmission line equipment
ICS Name: \nTransmission lines and distribution lines
Publish Date: 2023-10-11
Implement Date: 2024-04-11

Scope

This document specifies the classification and naming, technical requirements, test methods, judgment criteria, marking, packaging, transportation, and storage requirements for insulated penetrating cable clamps. This document is applicable to insulated penetrating cable clamps for overhead power lines, bridges and culverts, tunnels, mine shafts, and cable ducts with a rated voltage of 20kV or less.

Development Information

Replace the following standards

Related Standards

Contact Us