T/JSQA 132-2022 Active Group standards

T/JSQA 132-2022 The total assembly of the hydraulic end of the cementing fracturing piston pump

T/JSQA 132-2022 The total assembly of the hydraulic end of the cementing fracturing piston pump

Publish Date: 2022-04-08 Implement Date: 2022-04-08 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/JSQA 132-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Oil
ICS Name: pump
Publish Date: 2022-04-08
Implement Date: 2022-04-08

Scope

Scope: This document specifies the model compilation rules, design requirements, raw materials and general requirements, test methods, inspection rules, marking, packaging, transportation and storage, and requirements for factory documents and surface protection for the hydraulic end assembly of well cementing and fracturing plunger pumps. This document applies to the design, manufacture, and acceptance of well cementing and fracturing plunger pumps - hydraulic end assemblies with a through diameter of 3.75 inches, 4 inches, 4.5 inches, and 5 inches, and a working pressure of 105 MPa and 140 MPa, used for operations such as well cementing, fracturing, acidizing, sand control, gravel packing, well killing, and well washing in oil and gas wells in oil fields. Main technical contents: 1. Model compilation rules: format compilation and structure; 2. Design requirements: plunger, pump head body, and fasteners; 3. Raw materials and general requirements: appearance, chemical composition, mechanical properties of the pump head body, grain size, non-destructive testing, strength and sealing performance, and lifting requirements.

Development Information

Related Standards

Contact Us