T/SEESA 024-2024 Active Group standards

T/SEESA 024-2024 Green methanol evaluation method

T/SEESA 024-2024 Green methanol evaluation method

Publish Date: 2024-12-23 Implement Date: 2025-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/SEESA 024-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Environmental protection
ICS Name: Integrated Environment and Environmental Protection
Publish Date: 2024-12-23
Implement Date: 2025-01-01

Scope

Scope: This document specifies the evaluation principles, basic requirements, evaluation methods, implementation processes, and product classification for the full life cycle evaluation of green methanol. This document applies to the evaluation activities of enterprises producing green methanol products, and third-party evaluation institutions can refer to it when conducting evaluation activities for green methanol products. Main technical content: 1. Evaluation boundaries: The evaluation boundaries of the full life cycle of green methanol specified in this document include all stages of primary green raw material collection, pretreatment, green methanol production, trade logistics, and end consumption. 2. Evaluation period: The statistical period for green methanol evaluation is the previous year, and the minimum trial operation period of green methanol production enterprises shall not be less than 6 months. 3. General requirements: (1) Throughout the entire life cycle from production to consumption of green methanol, full emphasis shall be placed on sustainability, and the production process shall reflect environmental responsibility and friendliness. (2) All stages of the full life cycle of green methanol shall ensure safe working conditions for staff. (3) The production and social activities of green methanol production enterprises shall comply with national and regional laws and regulations, and there shall be no major environmental pollution incidents or safety accidents resulting in personnel deaths within the past three years. (4) The collection, storage, and disposal of general solid waste from green methanol production enterprises shall comply with the relevant provisions of GB 18599. The storage of hazardous waste shall comply with the relevant provisions of GB 18597, and it shall be handed over to units holding hazardous waste operation licenses for disposal. (5) Green methanol production enterprises shall establish and operate quality m

Development Information

Related Standards

Contact Us