T/GDWCA 0013-2018: Operation Specifications for Stranding Wire Process
T/GDWCA 0013-2018
Basic Information
Scope
Scope: This standard specifies the preparation work, precautions, operating procedures, and records for the stranding process. This standard is applicable to the stranding process in the cable production process, where several semi-finished cable components are combined with various required raw materials; Main technical content: Precautions: 1. When unloading materials from packaging, avoid damaging the semi-finished products. 2. Before the machine has completely stopped running, it is strictly prohibited to put one's head or hands into the machine to avoid safety accidents. 3. The interface of the joints should be free of burrs, and the length of the joints should be within the range of (7-10) mm. If it is too short, it may cause a short circuit; if it is too long, it may cause an open circuit. 4. During normal production (winding), the reels should not be filled too full, and the semi-finished products should be more than 20 mm below the edge of the reel disc. 5. When stranding copper wires, there should be no wire breakage phenomenon, so as to avoid wire breakage during subsequent processing.