T/CES 075-2021 Evaluation Guidelines for the Construction of Electrical Power Company's Distribution Network Operation Capability without Interruption
T/CES 075-2021 Evaluation Guidelines for the Construction of Electrical Power Company's Distribution Network Operation Capability without Interruption
Basic Information
Scope
Scope: This document specifies the method and indicator system for evaluating the capability of conducting non-stop power supply operations on 10kV/20kV distribution networks. This document is applicable to regional power supply enterprises that have the responsibility for managing non-stop power supply operations and are capable of independently conducting such operations, for self-evaluation or third-party evaluation purposes. Main technical content: This document provides regional power supply enterprises with a method and indicator basis for evaluating the capability of conducting non-stop power supply operations on distribution networks. By analyzing the development needs and current situation of non-stop power supply operations, it comprehensively evaluates various factors such as leadership, development planning, basic framework, on-site safety, personnel requirements, equipment requirements, technical requirements, operating environment, and evaluation and incentives, helping regional power supply enterprises clearly understand their current situation, promote the improvement of non-stop power supply operation capabilities, and ultimately enhance regional power supply reliability and optimize the business environment. This document is based on the power industry standard "Guidelines for Planning Non-Stop Power Supply Operations on 10kV (20kV) and Below Distribution Networks" (T/CES 048), and compiles standard content in accordance with requirements of GB/T 26859 "Electricity Safety Work Procedures - Power Line Section", GB/T 14286 "Terminology for Live Working Tools and Equipment", GB/T 18857 "Technical Guidelines for Non-Stop Power Supply Operations on Distribution Lines", DL/T 974 "Tool Storage Room for Live Working", and DL/T 976 "Preventive Test Procedures for Live Working Tools, Devices, and Equipment". This document specifies the method and indicator system for evaluating the capability of conducting non-stop power supply operations on 10kV/20kV distri