T/SHJX 045-2022 Initial safety evaluation technical standards for urban rail transit operation
T/SHJX 045-2022 Initial safety evaluation technical standards for urban rail transit operation
Basic Information
Scope
Scope: This standard applies to the pre-operation safety assessment of urban rail transit projects with a design speed of 100km/h to 160km/h in new construction, reconstruction, and expansion. Main technical content: With the development of suburban areas and satellite cities in major cities and the increasing demand for inter-city transportation, urban rail transit has received widespread attention due to its large passenger capacity and convenient operation. In accordance with the requirements of the Shanghai Transportation Industry Association's "Notice on the Issuance of the '2021 Shanghai Urban Rail Transit Specification Standards Preparation Plan'" (No. 2 of the Shanghai Transportation Industry Association Urban Rail Transit Committee), the Shanghai Transportation Industry Association and China Railway Shanghai Design Group Co., Ltd., together with relevant units, conducted extensive investigations and studies, carefully summarized practical experience, and referred to relevant domestic and international standards and norms. After soliciting opinions repeatedly, this standard was formulated. The main technical content of this standard includes: General Provisions; Terminology, Abbreviations, and Symbols; Preconditions; System Function Verification; System Linkage Testing; Operation Preparation; Appendix A; Appendix B; and Appendix C. (1) General Provisions: Specifies the purpose of preparing this standard, its scope of application, and general requirements, clarifying that this standard applies to the pre-operation safety assessment of urban rail transit projects with a design speed of 100km/h to 160km/h in new construction, reconstruction, and expansion in this city. (2) Terminology, Abbreviations, and Symbols: Explains the terminology, abbreviations, and symbols used in this document. (3) Preconditions: Specifies the preconditions for conducting pre-operation safety assessments. (4) System Function Verification: Specifies the requirements for verif