GB/T 14173-1993
Replaced
T/GZWEA D01-2025
Active
Group standards
T/GZWEA D01-2025 The Preparation Regulations for Ecological and Environmental Protection Estimates of Water Resources and Hydropower Projects in Guizhou Province
T/GZWEA D01-2025 The Preparation Regulations for Ecological and Environmental Protection Estimates of Water Resources and Hydropower Projects in Guizhou Province
Price:
$ 20.00
Basic Information
Standard Code:
T/GZWEA D01-2025
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Hydraulic structures
Publish Date:
2025-02-26
Implement Date:
2025-02-26
Scope
Main technical content: the composition of the design budget estimate and the basis for preparing the budget estimate documents; the composition of the budget estimate documents; the project composition and division; the cost structure; the preparation method and calculation standards; and the investment estimate.
Development Information
Related Standards
GB/T 20203-2006
Replaced
GB/T 20203-2006 Technical specification for irrigation projects with low pressure pipe conveyance
GB/T 21303-2007
Replaced
GB/T 21303-2007 Specification for water measuring of irrigation canal system
GB/T 30949-2014
Replaced
GB/T 30949-2014 Post evaluation standard for water saving irrigation project
GB/T 32748-2016
Active
GB/T 32748-2016 Canal lining and seepage prevention materials
GB/T 20203-2017
Active