T/CSGPC 008-2023 Basic Technical Requirements for Integrated Surveying of Engineering Construction Projects
T/CSGPC 008-2023
Basic Information
Scope
Scope: This document stipulates the overall requirements for the integration of multiple surveys into one for engineering construction projects, control surveys, basic element surveys, and the technical requirements for surveying and mapping at various stages, including project land planning approval, engineering construction approval, construction approval, and completion acceptance. This document applies to the integration of multiple surveys into one for engineering construction projects such as housing construction and urban infrastructure. Main technical content: This standard is divided into 12 chapters, 56 sections, 4 appendices, and 27 appendix sections. 1. Scope 2. Normative reference documents 3. Terms and definitions 4. Abbreviations 5. Overall requirements 6. Control surveys 7. Basic element surveys 8. Physical element surveys 9. Surveying and mapping at the project land planning approval stage 10. Surveying and mapping at the engineering construction approval stage 11. Surveying and mapping at the construction approval stage 12. Surveying and mapping at the completion acceptance stage Appendix A (informative): Example of the Integrated Survey Report at the Project Land Planning Approval Stage Appendix B (informative): Example of the Integrated Survey Report at the Engineering Construction Approval Stage Appendix C (informative): Example of the Integrated Survey Report at the Construction Approval Stage Appendix D (informative): Example of the Integrated Survey Report at the Completion Acceptance Stage References