T/JSJTQX 31-2022 Active Group standards

T/JSJTQX 31-2022 Management Specification for Instrument Equipment of Highway and Waterway Engineering Laboratory in Jiangsu Province

T/JSJTQX 31-2022 Management Specification for Instrument Equipment of Highway and Waterway Engineering Laboratory in Jiangsu Province

Publish Date: 2022-11-30 Implement Date: 2022-12-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/JSJTQX 31-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Civil Engineering Comprehensive
Publish Date: 2022-11-30
Implement Date: 2022-12-01

Scope

Scope: This document stipulates the basic regulations for the management of instruments and equipment in construction site laboratories, the verification of instruments and equipment, the calibration of instruments and equipment, the self-calibration of instruments and equipment, verification/calibration reports, the confirmation of the conformity of verification/calibration results, interim verification, and the management of instruments and equipment, among other related norms; Main technical content: The technical content of the "Jiangsu Province Highway and Waterway Engineering Construction Site Laboratory Instrument and Equipment Management Code" introduces that the management of instruments and equipment in construction site laboratories is one of the key contents of the management of testing and inspection, and also a prerequisite for ensuring the accuracy of testing and inspection data. Due to the lack of standardized guidance, there are more prominent problems in the equipping, installation and debugging, verification and calibration of instruments and equipment in construction site laboratories, mainly manifested as incomplete auxiliary tools when equipping instruments, non-standard installation of instruments and equipment, inadequate debugging work, non-standard verification and calibration of instruments and equipment, unfavorable implementation of interim verification, and non-standard management of instrument and equipment files. During the drafting of this document, we closely combined the existing problems in the management of instruments and equipment in construction site laboratories in Jiangsu Province, conducted extensive research and widely adopted the opinions of industry experts, and finally proposed basic regulations for the management of instruments and equipment in construction site laboratories, verification of instruments and equipment, calibration of instruments and equipment, self-calibration of instruments and equipment, verification

Development Information

Related Standards

Contact Us