DB31/T 853-2014 Replaced Shanghai CityLocal standards

DB31/T 853-2014 Technical specifications for optimizing the utilization of surplus energy in a circulating cooling water system

DB31/T 853-2014 Technical specifications for optimizing the utilization of surplus energy in a circulating cooling water system

Publish Date: 2014-11-11 Implement Date: 2015-03-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: DB31/T 853-2014
Standard Type: Local standards
Standard Status: Replaced
is_force_gb: no
CCS Name: Technical management
ICS Name: Heat recovery, thermal insulation
Publish Date: 2014-11-11
Implement Date: 2015-03-01
Pages: 12 pages

Scope

This standard specifies the technical measures for the recovery and utilization of surplus energy in the cooling tower circulating cooling water system. This standard applies to water-driven fan cooling towers and their systems, as well as to cooling towers driven by a combination of water and electric power, jet cooling towers, and their systems.

Development Information

Word Count: 16 Thousand words Pages: 12 pages

Superseded by the following standards

Referenced Standards

Related Standards

Contact Us