T/CITSA 24-2022 Highway free flow tolling technical specifications based on ETC
T/CITSA 24-2022 Highway free flow tolling technical specifications based on ETC
Basic Information
Scope
Main technical content: It standardizes the overall architecture of the free-flow toll collection system, which consists of the toll road network settlement management center, the provincial network settlement management center, the regional center/section center, and the ETC gantry system, and clarifies the responsibilities, service requirements, and technical solutions of each business segment. In terms of audit management, the standard specifies that the audit of the free-flow toll collection system is divided into internal audit and external audit. In terms of fee recovery, the standard specifies that all participating parties should take measures to recover the unpaid, underpaid, or refused to pay toll fees from vehicles. In terms of credit management, the standard proposes that a credit system for free-flow toll collection on highways should be established. All vehicles using toll roads should be regarded as credit subjects and included in the scope of credit management, with credit files established and credit ratings evaluated.