T/CAS 769-2023 Urban integrated utility corridor operation and management evaluation specification
T/CAS 769-2023 Urban integrated utility corridor operation and management evaluation specification
Basic Information
Scope
Main technical content: 1. Scope This document specifies the general requirements for the evaluation of the operation and management of urban comprehensive pipe galleries, as well as the evaluation indicators, evaluation implementation, and evaluation reports. This document is applicable to the evaluation and assessment of the operation and management of urban comprehensive pipe galleries. 2. Normative reference documents The content of the following documents is incorporated into this document through normative references. Among them, the referenced documents with a specified date apply only to the version corresponding to that date; the referenced documents without a specified date apply to the latest version (including all amendment orders) of these documents. - GB 50838: Technical Specifications for Urban Comprehensive Pipe Gallery Projects - GB/T 51274: Technical Standards for Urban Comprehensive Pipe Gallery Monitoring and Alarm Systems - GB 51354: Technical Standards for the Operation, Maintenance, and Safety of Urban Underground Comprehensive Pipe Galleries 3. Terms and definitions The terms and definitions defined in GB 50838 and GB 51354, as well as the following terms and definitions, apply to this document. 3.1 Utility Tunnel Operation Management The activities of operation, running, management, and maintenance carried out to ensure the normal operation of the comprehensive pipe gallery body and its ancillary facilities and to provide a safe and stable operating environment for the pipelines entering the gallery. 3.2 Operation and Management Unit The unit responsible for the operation and management of the comprehensive pipe gallery. [Source: GB/T 38550-2020, Section 3.2, with modifications]