T/CHTS 10171-2024 Active Group standards

T/CHTS 10171-2024 Full-face Rock Dredger Method Guide for Highway Tunnel Design

T/CHTS 10171-2024 Full-face Rock Dredger Method Guide for Highway Tunnel Design

Publish Date: 2024-09-29 Implement Date: 2024-10-13 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CHTS 10171-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: \nTunnel construction
Publish Date: 2024-09-29
Implement Date: 2024-10-13

Scope

Main technical content: The main content includes: general provisions, terms and symbols, engineering survey, overall design, selection of tunnel boring equipment, loads, materials, structural calculation, lining structure design, design of special geological sections, waterproofing and drainage, monitoring and advance forecasting

Development Information

Related Standards

Contact Us