T/CEPPEA 5040-2023 Active Group standards

T/CEPPEA 5040-2023 Code for completion acceptance of power supply and distribution line engineering

T/CEPPEA 5040-2023 Code for completion acceptance of power supply and distribution line engineering

Publish Date: 2023-10-19 Implement Date: 2024-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 43.00
Out of stock

Basic Information

Standard Code: T/CEPPEA 5040-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Power transmission and transformation projects
ICS Name: Integrated power station
Publish Date: 2023-10-19
Implement Date: 2024-01-01
Pages: 24 pages

Scope

This document establishes the general principles for the completion and acceptance of power supply and distribution lines with voltages of 110 kV and below, and stipulates the basic requirements for the completion and acceptance of overhead lines, cable lines, various components, acceptance procedures, and documentation and archiving.
This document is applicable to the completion and acceptance of new, modified, and expanded power supply and distribution line projects with voltages of 110 kV and below.

Development Information

Word Count: 35 Thousand words Pages: 24 pages

Related Standards

Contact Us