T/ZZXJX 227-2022
Active
Group standards
T/ZZXJX 227-2022 Deep foundation pit steel sheet pile retaining technique specification
T/ZZXJX 227-2022 Deep foundation pit steel sheet pile retaining technique specification
Price:
$ 20.00
Basic Information
Standard Code:
T/ZZXJX 227-2022
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Earthwork, excavation, foundation construction, and underground engineering
Publish Date:
2022-12-16
Implement Date:
2022-12-16
Scope
Main technical content: 1 Scope 2 Normative reference documents 3 Terms and definitions 4 Basic provisions 5 Materials and equipment 5.1 Materials 5.2 Equipment 6 Survey and environmental investigation 6.1 General provisions 6.2 Survey requirements 6.3 Environmental investigation 7 Supporting structure design 7.1 General provisions 7.2 Load calculation 7.3 Structural analysis and stability verification 7.4 Component design 7.5 Durability design 7.6 Project construction 7.7 General provisions 7.8 Construction preparation 7.9 Lifting and stacking 7.10 Pile driving construction 8. Monitoring and inspection 8.1 Monitoring 8.2 Inspection and acceptance
Development Information
Related Standards
GB/T 18507-2001
Replaced
GB/T 18508-2001
Replaced
GB/T 18508-2001 Regulations for valuation on urban land
CJ/T 234-2006
Active
CJ/T 234-2006 High density polyethylene geomembrane for landfills
CJ/T 284-2008
Active
CJ/T 284-2008 Φ5.5 m~Φ7 m Earth pressure balance shield(soft ground)
CJ/T 378-2011
Active
CJ/T 378-2011 Mobile toilet
JG/T 163-2013
Active