T/CI 489-2024 Active Group standards

T/CI 489-2024 Open-cut TBM construction tunnel vibration monitoring technical specification

T/CI 489-2024 Open-cut TBM construction tunnel vibration monitoring technical specification

Publish Date: 2024-09-02 Implement Date: 2024-09-02 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CI 489-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Earth and stone work, tunnel engineering
ICS Name: \nTunnel construction
Publish Date: 2024-09-02
Implement Date: 2024-09-02

Scope

Scope: This document specifies the methods and technical requirements for vibration monitoring and data processing of key components of open-face TBMs and the surrounding rock behind the face of the cutter. This document is applicable to vibration monitoring of key components of open-face TBMs (cutterhead, support boots, and shield), as well as monitoring of surface vibration of the surrounding rock behind the face of the cutter caused by the vibration effect of open-face TBM excavation. Main technical content: This document specifies the methods and technical requirements for vibration monitoring and data processing of key components of open-face TBMs and the surrounding rock behind the face of the cutter. This document is applicable to vibration monitoring of key components of open-face TBMs (cutterhead, support boots, and shield), as well as monitoring of surface vibration of the surrounding rock behind the face of the cutter caused by the vibration effect of open-face TBM excavation.

Development Information

Related Standards

Contact Us