T/XDHX 0008-2023 Active Group standards

T/XDHX 0008-2023 Wind power plant overhead line defrosting technical specifications

T/XDHX 0008-2023 Wind power plant overhead line defrosting technical specifications

Publish Date: 1970-01-01 Implement Date: 1970-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 31.00
Download

Basic Information

Standard Code: T/XDHX 0008-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: -
Publish Date: 1970-01-01
Implement Date: 1970-01-01

Scope

This document specifies the contents of ice melting for overhead lines in wind farms, including ice melting for transmission lines, collection lines, grounding lines, ice melting processes, and safety requirements. This document is applicable to ice melting for overhead transmission lines, collection lines, and grounding lines in wind farms with a grid-connected voltage level of 35 kV to 220 kV. For wind farms and photovoltaic power stations with other voltage levels, the requirements in this document may be used as a reference for implementation.

Development Information

Word Count: 19 Thousand words

Related Standards

Contact Us