GB/T 14627-1993
Replaced
T/CEC 5071-2022
Active
Group standards
T/CEC 5071-2022 Report Preparation Guidelines for the Overall Layout Planning of a Pumping Hydro Storage Power Station Construction
T/CEC 5071-2022 Report Preparation Guidelines for the Overall Layout Planning of a Pumping Hydro Storage Power Station Construction
Price:
$ 20.00
Basic Information
Standard Code:
T/CEC 5071-2022
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Hydraulic engineering
Publish Date:
2022-10-26
Implement Date:
2023-02-01
Scope
Main technical content: This regulation is formulated to standardize the principles, work content, and depth requirements for the preparation of the special report on the general layout planning of pumped storage power stations. This regulation is applicable to the preparation of the special report on the general layout planning of pumped storage power stations. In addition to complying with this regulation, the preparation of the special report on the general layout planning of pumped storage power stations shall also comply with the provisions of the relevant national standards currently in force.
Development Information
Related Standards
GB/T 15468-1995
Replaced
GB/T 15468-1995 Fundamental technical requirements for hydraulic turbines
GB/T 15469-1995
Replaced
GB/T 15469-1995 Cavitation pitting evaluation in reaction hydraulic turbines
GB/T 15613-1995
Replaced
GB/T 15613-1995 Code for model acceptance tests of hydraulic turbines
GB/T 16166-1996
Replaced
GB/T 16166-1996 Sacrificial anode cathodic protection for seawater cooling system in coastal power station
GB/T 10969-1996
Replaced