T/YNRZ 007-2023 Active Group standards

T/YNRZ 007-2023 Seedling Mango Orchard Cultivation with Passion Fruit Technical Regulations

T/YNRZ 007-2023 Seedling Mango Orchard Cultivation with Passion Fruit Technical Regulations

Publish Date: 2023-07-18 Implement Date: 2023-08-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Download

Basic Information

Standard Code: T/YNRZ 007-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Plant cultivation
Publish Date: 2023-07-18
Implement Date: 2023-08-01
Pages: 7 pages

Scope

Scope: This document specifies the terminology and definitions, preparation for planting, establishment, management, pest and disease control, and harvesting techniques for intercropping passion fruit with young mango orchards. This document applies to the production technology of intercropping passion fruit with young mango orchards. Main technical content: 1. Terminology and definitions: There are no terms or definitions requiring definition in this document. 2. Preparation for planting: 2.1 Site selection: It is recommended to select sunny, well-watered, and easy-to-irrigate and drainage areas with convenient transportation for young mango orchards or orchards undergoing variety renewal. The soil should be high in elevation, with good drainage and water permeability, fertilizer retention, and water conservation. The soil layer depth should be ≥1.0 m, and the soil pH should be between 6.5 and 7.5. The soil environmental quality should meet the requirements of GB 15618. 2.2 Fence construction: Draw horizontal and vertical lines 80 cm to 100 cm away from the trunk center along the rows of fruit trees, with a fence height of 180 cm to 200 cm. The fence should be a vertical and ground-level plane with a certain height. 2.3 Land preparation and base fertilization: Level the soil surface, remove weeds, determine planting points based on planting density, and dig holes (diameter 50 cm, depth 40 cm). Add 3 kg to 5 kg of composted organic fertilizer and 0.5 kg of phosphorus fertilizer to each hole, mix well with the raw soil. The quality and technical indicators of commercial organic fertilizers should meet the requirements of NY/T 525. 2.4 Ridge construction and film covering: Build ridges along the fence and cover them with film. The ridge width should be 0.8 m to 1 m, with 1 row per ridge and a planting spacing of 2.0 m. Drainage ditches 50 cm wide and 30 cm to 40 cm deep should be dug on both sides of the ridge. 3. Planting: 3.1 Seedling selection: Select healthy, w

Development Information

Pages: 7 pages

Related Standards

Contact Us