PDF

GB/T 18134-2025 Active

GB/T 18134-2025 High-voltage test techniques—Very-fast-front overvoltage measurements

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2025-10-05

Abstract

This document describes the characteristics of ultra-fast front-wave overvoltage and common measurement methods for ultra-fast front-wave overvoltage, and specifies the basic requirements, transfer characteristics, and verification procedures of the measurement system.
This document is applicable to the measurement of ultra-fast front-wave overvoltage generated by the operation or internal destructive discharge of gas-insulated metal-enclosed switchgear, especially the measurement systems for the following three types of ultra-fast front-wave overvoltage:
—— Internal ultra-fast front-wave overvoltage;
—— Transient shell voltage;
—— External ultra-fast front-wave overvoltage.

General Product Information

Document Type National standards
Standard Status Active
Standard Code GB/T 18134-2025
CCS Power transmission and transformation equipment
ICS Electrician and electronic testing
Implement Date 2026-05-01
Price $ 62.00
Subtotal $ 62.00
Tax $ 0.00
Order Total (incl. tax) $ 62.00

Log In

Contact Us