GB/T 18134-2025 Active National standards

GB/T 18134-2025 High-voltage test techniques—Very-fast-front overvoltage measurements

GB/T 18134-2025 High-voltage test techniques—Very-fast-front overvoltage measurements

Publish Date: 2025-10-05 Implement Date: 2026-05-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 18134-2025
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Power transmission and transformation equipment
ICS Name: Electrician and electronic testing
Publish Date: 2025-10-05
Implement Date: 2026-05-01
Pages: 32 pages

Scope

This document describes the characteristics of ultra-fast front-wave overvoltage and common measurement methods for ultra-fast front-wave overvoltage, and specifies the basic requirements, transfer characteristics, and verification procedures of the measurement system.
This document is applicable to the measurement of ultra-fast front-wave overvoltage generated by the operation or internal destructive discharge of gas-insulated metal-enclosed switchgear, especially the measurement systems for the following three types of ultra-fast front-wave overvoltage:
—— Internal ultra-fast front-wave overvoltage;
—— Transient shell voltage;
—— External ultra-fast front-wave overvoltage.

Development Information

Word Count: 44 Thousand words Pages: 32 pages

Replace the following standards

Referenced Standards

Related Standards

Contact Us