GB/T 14627-1993
Replaced
T/CEC 5075-2022
Active
Group standards
T/CEC 5075-2022 Drainage design guidelines for pumped hydro storage power station construction
T/CEC 5075-2022 Drainage design guidelines for pumped hydro storage power station construction
Price:
$ 20.00
Basic Information
Standard Code:
T/CEC 5075-2022
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Hydraulic engineering
Publish Date:
2022-10-26
Implement Date:
2023-02-01
Scope
1.0.1 These guidelines are formulated to standardize the design of diversion for the construction of pumped storage power stations, ensuring that the design is technologically advanced, safe and practical, and economically reasonable. 1.0.2 These guidelines are applicable to the design of diversion for the construction of pumped storage power stations. 1.0.3 For the design of diversion for the construction of pumped storage power stations, in addition to complying with these guidelines, it shall also comply with the provisions of the relevant national standards currently in force.
Development Information
Related Standards
GB/T 15468-1995
Replaced
GB/T 15468-1995 Fundamental technical requirements for hydraulic turbines
GB/T 15469-1995
Replaced
GB/T 15469-1995 Cavitation pitting evaluation in reaction hydraulic turbines
GB/T 15613-1995
Replaced
GB/T 15613-1995 Code for model acceptance tests of hydraulic turbines
GB/T 16166-1996
Replaced
GB/T 16166-1996 Sacrificial anode cathodic protection for seawater cooling system in coastal power station
GB/T 10969-1996
Replaced