T/JSWA 009-2024 Active Group standards

T/JSWA 009-2024 The technical guideline for the full lifecycle management process of urban water supply pipeline networks

T/JSWA 009-2024 The technical guideline for the full lifecycle management process of urban water supply pipeline networks

Publish Date: 2024-01-17 Implement Date: 2024-01-18 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 50.00
Download

Basic Information

Standard Code: T/JSWA 009-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Outdoor water supply and drainage projects
ICS Name: The water supply system
Publish Date: 2024-01-17
Implement Date: 2024-01-18

Scope

Scope: This document is applicable to the operation and management of urban water supply networks (excluding secondary water supply in residential areas) and their ancillary facilities at all stages, and can be used as a technical basis for the management of urban water supply networks. Main technical content: This document stipulates the requirements and recommendations for the management processes of urban water supply networks, including planning and design, engineering construction, network mapping, operation and maintenance, and informatization.

Development Information

Related Standards

Contact Us