GB/T 45905.5-2025 Active National standards

GB/T 45905.5-2025 Electricity spot market operation—Part 5:Calculation method of incorporating intermittent new energy into power system balance

GB/T 45905.5-2025 Electricity spot market operation—Part 5:Calculation method of incorporating intermittent new energy into power system balance

Publish Date: 2025-08-01 Implement Date: 2026-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 33.00
Download

Basic Information

Standard Code: GB/T 45905.5-2025
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Electricity
ICS Name: The transmission grid and the distribution grid
Publish Date: 2025-08-01
Implement Date: 2026-02-01
Pages: 12 pages

Scope

This document specifies the requirements for the basic data sources, data processing methods, and calculation methods for wind power, photovoltaics, and other new energy sources to participate in power balancing at different time scales under the environment of the electricity spot market.
This document is applicable to provincial and higher-level power grids for calculating the reliable generating capacity of wind power, photovoltaics, and other new energy sources to be included in power balancing, analyzing and estimating the adequacy of power supply, determining unit combinations, and verifying the balance of transactions, etc.

Development Information

Word Count: 15 Thousand words Pages: 12 pages

Same series standard

Referenced Standards

Related Standards

Contact Us