T/GDWCA 0013-2018 Abolished Group standards

T/GDWCA 0013-2018: Operation Specifications for Stranding Wire Process

T/GDWCA 0013-2018

Publish Date: 2018-01-31 Implement Date: 2018-02-28 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/GDWCA 0013-2018
Standard Type: Group standards
Standard Status: Abolished
is_force_gb: no
CCS Name: Integrated services in the fields of medicine, health, and labor protection
ICS Name: Comprehensive Electrical Engineering
Publish Date: 2018-01-31
Implement Date: 2018-02-28

Scope

Scope: This standard specifies the preparation work, precautions, operating procedures, and records for the stranding process. This standard is applicable to the stranding process in the cable production process, where several semi-finished cable components are combined with various required raw materials; Main technical content: Precautions: 1. When unloading materials from packaging, avoid damaging the semi-finished products. 2. Before the machine has completely stopped running, it is strictly prohibited to put one's head or hands into the machine to avoid safety accidents. 3. The interface of the joints should be free of burrs, and the length of the joints should be within the range of (7-10) mm. If it is too short, it may cause a short circuit; if it is too long, it may cause an open circuit. 4. During normal production (winding), the reels should not be filled too full, and the semi-finished products should be more than 20 mm below the edge of the reel disc. 5. When stranding copper wires, there should be no wire breakage phenomenon, so as to avoid wire breakage during subsequent processing.

Development Information

Related Standards