T/CAPID 005.4-2023 Active Group standards

T/CAPID 005.4-2023 Garbage incineration power generation engineering quality supervision and inspection outline Part 4: Supervision and inspection before the acceptance of the power system of the plant's electrical system

T/CAPID 005.4-2023 Garbage incineration power generation engineering quality supervision and inspection outline Part 4: Supervision and inspection before the acceptance of the power system of the plant's electrical system

Publish Date: 2023-03-08 Implement Date: 2023-06-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CAPID 005.4-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Integrated power station
Publish Date: 2023-03-08
Implement Date: 2023-06-01

Scope

Main technical content: This document stipulates the supervision and inspection of the power supply system of the waste incineration power generation project before it is put into operation, including the general principles of supervision and inspection and the verification methods, the conditions that should be met for supervision and inspection, the requirements for supervision and inspection of the quality behavior of the responsible entities, the requirements for supervision and inspection of the physical quality of the project, and the quality supervision and testing requirements.

Development Information

Same series standard

Related Standards

Contact Us